What was found
DURING C-18 CHECK A 3/4 INCH CRACK WAS FOUND ON THE UPPER T-CHORD AT BS 727B, RBL 25. MAINTENANCE TRIMED OUT CRACKED AREA OF UPPER T-CHORD AT BS 727B, RBL 25. PERFORMED A HFEC INSPECTION TO VERIFY NO CRACKS EXIST. FABRICATED 2 EACH STRAPS, A FILLER, AND A SHIM; INSTALLED REPAIR PARTS IAW AWA ER 03-5702-02191-SS1.