What was found
LCQ - MAJOR REPAIR - DURING C-11 CHECK CORROSION WAS FOUND ON CABIN FLOORBEAM AT BS 1640, LBL 25 TO LBL 35. MAINTENANCE REMOVED DAMAGED SECTION OF FLOORBEAM BS 1640, FABRICATED 2 EACH REPAIR ANGLES, 2 EACH STRAPS, AND A CHORD, AND INSTALLED REPAIR PARTS IAW B757-200 SRM 53-00-51, PG. 209-213.