What was found
MCN - MAJOR REPAIR - DURING C-18 CHECK A 1 3/8" CRACK WAS FOUND ON EXTERNAL SKIN, INTERNAL DOUBLER, AND STRAP AT L2 DOOR FORWARD LOWER CUTOUT BS 950, STR 17 L/H. HFEC & 10X VISUAL CONFIRMED. MAINTENANCE STOP DRILLED CRACK ON SKIN, INTERNAL DOUBLER, AND STRAP AT L2 DOOR FORWARD LOWER CUTOUT BS 950, STR 17 L/H, PERFORMED A HFEC INSPECTION TO VERIFY CRACK IS CONTAINED. FABRICATED 3 EACH REPAIR DOUBLERS AND TAPERED SHIMS, INSTALLED RIVET IN STOP DRILL HOLE, AND INSTALLED REPAIR PARTS IAW AWA ER 03-5300-02196-TB3.