What was found
MCN - MAJOR REPAIR - DURING C-14 CHECK A 1 INCH CRACK WAS FOUND AT VERTICAL STIFFENER BS 178, LBL 5.7, WL 184. MAINTENANCE CUTOUT DAMAGE AT VERTICAL STIFFENER BS 178, LBL 5.7, WL 184; FABRICATED 4 EACH REPAIR ANGLES, 2 EACH STRAP, AND 6 EACH FILLERS; AND INSTALLED REPAIR PARTS IAW B737-300 SRM 53-10-08, PG. 221-240, FIG 205.