What was found
MCN - MAJOR REPAIR - DURING C-17 CHECK A 2.3125 INCH CRACK WAS FOUND ON FLOOR SUPPORT CHANNEL IN AFT CARGO COMPARTMENT BS 727D, LBL 3. MAINTENANCE CUTOUT DAMAGED SECTION OF FLOOR SUPPORT CHANNEL IN AFT CARGO COMPARTMENT BS 727D, LBL 3; FABRICATED A 2 EACH REPAIR ANGLES AND A CHANNEL FILLER; INSTALLED REPAIR PARTS IAW B737-300 SRM 53-00-53, FIG. 201, PG. 201-202.