What was found
DURING C-09 CHECK EXFOLIATION CORROSION WAS FOUND ON 3 EACH GALLEY SUPPORT FITTINGS ON AFT SHEAR DECK AT BS 1681 LT, BS 1681R/H, AND BS 1715 LT. MAINTENANCE REMOVED AND REPLACED 3 EACH GALLEY SUPPORT FITTINGS ON AFT SHEAR DECK AT BS 1681 LT, BS 1681 RT, AND BS 1715 LT IAW B757-200 SRM 51-40-02, PG. 12.