What was found
AT CRUISE FL 360, NR 2 ENG COMPRESSOR VANE ECAM MSG, AT FL 290 NR 2 ENG STALLED. SHUTDOWN ENG, EMERGENCY EQUIP TO STANDBY. LANDED, TAXIED TO GATE. REPORT INDICATED NR 2 ENG OVERTEMP 663'C APPX 7 SEC. MX INSPECTED INTERMEDIATE PRESSURE CHECK VALVE, FAULT ISOLATION TEST OF FULL AUTHORITY DIGITAL ENG CONTL CHANNELS 1 & 2, NO DEFECTS. PERFORMED BORESCOPE INSP OF HOT SECTION & HPC, NO DEFECTS. PERFORMED WINDMILLING INSP, NO DEFECTS. COMPLIED WITH BURNER PRESSURE SENSE LINE LEAK CHECK. R&R 10TH STAGE HPT AIR CONTROL VALVE. PERFORMED HPC BLEED VALVE FUNCTIONAL TEST, FOUND VALVE FAULTY, R&R HPC BLEED VALVE SOLENOID. REPLACED VSV ACTUATOR. PERFORMED POWER ASSURANCE RUN & ACCEL/DECEL, ALL NORMAL.