Service difficulty report · Warning System · Boeing 7373G7

Difficulty date
June 26, 2003
Submitted
August 12, 2003
Operation
Air carrier
Aircraft
N309AW
Make and model
Boeing 7373G7
Aircraft serial
24711
Aircraft time
42,426 hours, 29,173 cycles
Part
Warning System
Condition
Malfunctioned
Location
Cockpit
Stage of operation
TO
How discovered
O
Nature of condition
N
Precautionary procedure
C

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

GEG - ABORTED TAKEOFF - FLT 0301 - ON TAKEOFF ROLL AT GEG EN ROUTE FOR PHX TAKEOFF CONFIGURATION HORN SOUNDED, REJECTED TAKEOFF BELOW 80 KNOTS, TAKEOFF THRUST NOT SET. RECONFIGURED TAKEOFF FLAP HANDLE, SPEED BRAKES, AND STAB TRIM; DEPARTED WITHOUT FURTHER EVENT.

More about the Boeing 737-3G7