What was found
MCN - MAJOR REPAIR - DURING C-14 CHECK A .1875 INCH CRACK WAS FOUND ON VERTICAL STIFFENER AT FORWARD SIDE OF FLOORBEAM BS 328, BL 0, WL 208. MAINTENANCE REMOVED CRACKED VERTICAL STIFFENER AT FORWARD SIDE OF FLOORBEAM BS 328, BL 0; FABRICATED A NEW REPLACEMENT VERTICAL STIFFENER PER DWG 65-45812; INSTALLED REPAIR PART IAW B737-300 SRM 51-40-02 PG 10-11 & 45, FIG 12.