What was found
DURING C-09 CHECK INTERGRANULAR CORROSION WAS FOUND AROUND NUT PLATE HOLES ON FLOOR STRINGER IN AFT CARGO COMPARTMENT BS 1280 TO BS 1360, LBL 18 TO RBL 20. MAINTENANCE CUTOUT CORRODED AREAS OF FLOOR STRINGER BS 1280 TO BS 1360, LBL 18 TO RBL 20; FABRICATED REPAIR PLATES AND FILLERS; INSTALLED REPAIR PARTS IAW B757-200 SRM 51-70-12, PG. 1, FIG. 1.