What was found
DURING C-15 CHECK 2 EACH 1 INCH CRACKS WERE FOUND IN INTERCOSTAL BETWEEN BS 1016 TO BS 1040, BL 0 TO RBL 15, WL 208.1. MAINTENANCE REMOVED CRACKED INTERCOSTAL BETWEEN BS 1016 TO BS 1040, BL 0 TO RBL 15; FABRICATED A NEW REPLACEMENT INTERCOSTAL PER DWG 65-54862; INSTALLED REPAIR PART IAW SRM 51-40-02 FIG 3, 8 & 12.