What was found
DURING C-15 CHECK A 2 INCH CRACK WAS FOUND IN INTERCOSTAL BETWEEN BS 1016 TO BS 1040, LBL 7 TO LBL 15, WL 208.1. MAINTENANCE REMOVED CRACKED INTERCOSTAL BETWEEN BS 1016 TO BS 1040, LBL 7 TO LBL 15; FABRICATED A NEW REPLACEMENT INTERCOSTAL PER DWG 65-54862; INSTALLED REPAIR PART IAW SRM 51-40-02 FIG 3, 8 & 12.