What was found
LAS - EEL - DURING 8-DAY CHECK LT OVERWING EMERGENCY POWER SUPPLY UNIT (11WL) CAUSES CIDS FAULT. MAINTENANCE REMOVED AND REPLACED EMERGENCY POWER SUPPLY UNIT (11WL), OPERATIONAL CHECK WAS GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LAS - EEL - DURING 8-DAY CHECK LT OVERWING EMERGENCY POWER SUPPLY UNIT (11WL) CAUSES CIDS FAULT. MAINTENANCE REMOVED AND REPLACED EMERGENCY POWER SUPPLY UNIT (11WL), OPERATIONAL CHECK WAS GOOD.