What was found
MCN - MAJOR REPAIR - DURING C-13 CHECK EXFOLIATION CORROSION WAS FOUND ON UPPER SURFACE OF TRANSVERSE FLOORBEAM TEE CAP AT BS 986, RBL 35 TO RBL 45, WL 208. MAINTENANCE REMOVED CORROSION ON TRANSVERSE FLOORBEAM TEE CAP AT BS 986, RBL 35 TO RBL 45 AND FOUND MATERIAL LOSS TO BE OUT OF LIMITS; FABRICATED A REPAIR STRAP; INSTALLED REPAIR PART IAW B737-300 SRM 53-00-51 FIG 203, PG 212-215.