What was found
PHX - EEL - DURING 8-DAY CHECK WHILE PERFORMING PUSH BUTTON TEST OF EMERGENCY LIGHT SYSTEM RECEIVED MESSAGE "EPSU UNIT FWD L". MAINTENANCE REMOVED AND REPLACED L/H FORWARD EMERGENCY POWER SUPPLY UNIT 10WL, OPERATIONAL CHECK WAS GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PHX - EEL - DURING 8-DAY CHECK WHILE PERFORMING PUSH BUTTON TEST OF EMERGENCY LIGHT SYSTEM RECEIVED MESSAGE "EPSU UNIT FWD L". MAINTENANCE REMOVED AND REPLACED L/H FORWARD EMERGENCY POWER SUPPLY UNIT 10WL, OPERATIONAL CHECK WAS GOOD.