What was found
LCQ - MAJOR REPAIR - DURING C-07 CHECK EXFOLIATION CORROSION WAS FOUND ON AFT CABIN SHEAR DECK BETWEEN BS 1710 AND BS 1720, LBL 20 TO RBL 20. MAINTENANCE REMOVED CORRODED SECTION OF AFT CABIN SHEAR DECK FROM BS 1710 TO BS 1720, LBL 20 TO RBL 20; FABRICATED A FILLER, DOUBLER, AND REPAIR HAT SECTION; INSTALLED REPAIR PARTS IAW B757-200, SRM 53-60-51, FIG. 203, PG. 1-5.