What was found
PHX - EEL - DURING OPERATIONAL TEST OF EMERGENCY LIGHTS RECEIVED FAILURE INDICATION, EPSU INT LOAD FWD L. MAINTENANCE REMOVED AND REPLACED LT FORWARD EMERGENCY POWER SUPPLY UNIT (10WL), OPERATIONAL CHECK WAS GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PHX - EEL - DURING OPERATIONAL TEST OF EMERGENCY LIGHTS RECEIVED FAILURE INDICATION, EPSU INT LOAD FWD L. MAINTENANCE REMOVED AND REPLACED LT FORWARD EMERGENCY POWER SUPPLY UNIT (10WL), OPERATIONAL CHECK WAS GOOD.