What was found
PHX - EEL - DURING 4-DAY CHECK THE LT FORWARD EMERGENCY POWER SUPPLY UNIT FAILED TEST. MAINTENANCE REMOVED AND REPLACED EMERGENCY POWER SUPPLY UNIT 10WL, OPERATIONAL CHECK WAS GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PHX - EEL - DURING 4-DAY CHECK THE LT FORWARD EMERGENCY POWER SUPPLY UNIT FAILED TEST. MAINTENANCE REMOVED AND REPLACED EMERGENCY POWER SUPPLY UNIT 10WL, OPERATIONAL CHECK WAS GOOD.