What was found
DURING 4-DAY CHECK RT OVER WING EMERGENCY POWER SUPPLY UNIT (EPSU) AND AFT ESPU FAILED EMERGENCY TEST. MAINTENANCE REMOVED AND REPLACED RT OVER WING EPSU (12WL) AND AFT EPSU (13WL) AND BATTERY PACKS; OPERATIONAL CHECK WAS GOOD. PART NAME; EPSU, MFG; DIEHL GMBH, P/N; 3214-54-10, S/N; 1355, TT; 21564, TC; 8764, LOC; ZONE 263