What was found
DURING SCHEDULED DEPLOYMENT OF THE R-3 DOOR SLIDE, THE SLIDE EXCEEDED INFLATION TIME FAILING THE TEST, SLIDE TOOK 13 SECONDS TO BECOME FULLY INFLATED. MAINTENANCE REMOVED AND REPLACED THE R-3 DOOR SLIDE ASSEMBLY. FOUND NO OBVIOUS REASON WHY SLIDE EXCEEDED DEPLOYMENT TIME. TWO SMALL HOLES WERE FOUND AND PATCHED, SLIDE WAS OVERHAULED AND A HYDRO TEST WAS ACCOMPLISHED ON HOSE AND CYLINDER, NO DEFECTS NOTED. PERFORMED OPS TEST OF SLIDE ON FLAT STAND, TEST WAS GOOD PER CMM 25-66-03, REV. 4.