What was found
MCN - MAJOR REPAIR - DURING C16 CHECK DISCOVERED INTERCOSTAL CRACKED AT BS 345, BL 0, WL 208. MAINTENANCE REMOVED CRACKED INTERCOSTAL AT BS 345 IAW BOEING 737-300 SRM 51-40-02-0G. RECEIVED NEW INTERCOSTAL AND PREPPED FOR INSTALLATION IAW BOEING 737-300 SRM 51-40-02-0G. INSTALLED REPAIR PARTS IAW BOEING 737-300 SRM 51-40-02-0G PAR 7D, 4A AND FIG 8.