What was found
MCN - DURING C16 CHECK DISCOVERED CRACKED FLOOR SHEAR TIE, 1.4 INCHES, BETWEEN BS 188 AND 196, OF FLIGHT STATION FLOOR AT WL 207, BL 34R. MAINTENANCE REMOVED DAMAGED FLOOR SHEAR TIE BETWEEN BS 188 AND 196 OF FLIGHT STATION FLOOR AT WL 207, FABRICATED NEW FLOOR SHEAR TIE AND INSTALLED FABRICATED FLOOR SHEAR TIE BETWEEN BS 188 AND 196 AT WL 207, BL 34R IAW BOEING 737-300 SRM 53-10-51-2R8 FIG 201.