What was found
GYR - DURING C08 CHECK DISCOVERED CORROSION, LEVEL 2 EXFOLIATION, ON LOWER SURFACE OF FLOOR SUPPORT CHANNEL FOR FORWARD CARGO DOOR SILL. CORROSION ADJACENT TO ATTACH FASTENER HOLES AT BL 20R, BS 615, WL 160. CORROSION OUT OF SRM LIMITS. MAINTENANCE REMOVED FWD CARGO DOOR SILL FROM BS 560 TO BS 640 IAW BOEING SRM 51-40-02-OG. FABRICATED DOUBLER. INSTALLED FABRICATED DOUBLER IAW BOEING SRM 53-40-02. INSTALLED NEW SIDE PANEL ASSEMBLY AT BL 20R, BS 615, WL 160 IAW BOEING SRM 51-40-02.