What was found
PHX - EEL - DURING 4 DAY CHECK, THE EMERGENCY LIGHT SYSTEM FAIL STEP 5 OF 4-DAY INSPECTION. MAINTENANCE REMOVED AND REPLACED THE RT MIDDLE EMERGENCY POWER SUPPLY UNIT AND BATTERY PACK. OPERATIONAL CHECKS WERE GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PHX - EEL - DURING 4 DAY CHECK, THE EMERGENCY LIGHT SYSTEM FAIL STEP 5 OF 4-DAY INSPECTION. MAINTENANCE REMOVED AND REPLACED THE RT MIDDLE EMERGENCY POWER SUPPLY UNIT AND BATTERY PACK. OPERATIONAL CHECKS WERE GOOD.