What was found
PHL - CREW REPORTED, DURING CLIMB TO F250 PACK 2 TRIPPED. TEMP 32 DEG C ZONE OUTPUT 92 DEG F, PACK FLOW STAYED IN THE LO POSITION. MX REMOVED AND REPLACED NR 2 PACK FLOW CONTROL VALVE PER AMM 21-51-51- 401, OPS/LEAK CHECK WAS GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PHL - CREW REPORTED, DURING CLIMB TO F250 PACK 2 TRIPPED. TEMP 32 DEG C ZONE OUTPUT 92 DEG F, PACK FLOW STAYED IN THE LO POSITION. MX REMOVED AND REPLACED NR 2 PACK FLOW CONTROL VALVE PER AMM 21-51-51- 401, OPS/LEAK CHECK WAS GOOD.