What was found
PHX - DURING SCHEDULED C9 INSPECTION, FOUND FLOOR BEAM UPPER SURFACE CORRODED BEYOND LIMITS AT FASTENER HOLES, STATION 957 LBL 29. INSTALLED ANGLE REPAIR PER SRM 53-30-51. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PHX - DURING SCHEDULED C9 INSPECTION, FOUND FLOOR BEAM UPPER SURFACE CORRODED BEYOND LIMITS AT FASTENER HOLES, STATION 957 LBL 29. INSTALLED ANGLE REPAIR PER SRM 53-30-51. (M)