What was found
PAE - FLT 3838 - DURING ROUTINE SCHEDULED C-3 MAINTENANCE CHECK, FOUND CORROSION ON FLOOR BEAM AT BS 350, RBL 2 - LBL 20, WL 208. PER ERR, BLENDED CORROSION ON BEAM. FABRICATED REPAIR ANGLE, ALODINED, PRIMED, AND INSTALLED PART WITH SEALANT PER ER 5-53-12-05, AND BOEING TELEX TCO-PAN-96-0413RR. (X)