What was found
PAI - FLT 3828 - DURING ROUTINE SCHEDULED C-12 MAINTENANCE CHECK, FOUND BS 327, LBL 45, WL 208, INTERCOSTAL CRACKED AT TOP AFT CORNER. REMOVED CRACKED INTERCOSTAL FROM BS 328 TO BS 312. FABRICATED AND INSTALLED NEW INTERCOSTAL PER SRM'S 51-10-02, 53-10-02, 53-10-05, 51-30-01. ACFT TT: 34,561 HRS. ACFT TC: 30,335. (X)