What was found
PAE - FLT 7820 - DURING ROUTINE SCHEDULED C-9 MAINTENANCE CHECK, FOUND CORROSION ON FLOOR BEAM UPPER CHORD UPPER SURFACE BS 947.5, WL 208, LBL 4 TO LBL 8. REMOVED DAMAGED AREA AT BS 947.5, WL 208, LBL 4 - LBL 8. FABRICATED AND INSTALLED REPAIR PARTS FROM BS 947.5, WL 208, LBL 4-RBL 65 IAW SRM 53-00-51. (M)