What was found
PAE - FLT 7803 - DURING ROUTINE SCHEDULED C-8 MAINTENANCE CHECK, FOUND CORROSION ON FLOOR BEAM BS 344, LBL 15 - 30, WL 208. REMOVED, FABRAICATED, INSTALLED REPAIR PARTS PER SRM 53-10-9. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PAE - FLT 7803 - DURING ROUTINE SCHEDULED C-8 MAINTENANCE CHECK, FOUND CORROSION ON FLOOR BEAM BS 344, LBL 15 - 30, WL 208. REMOVED, FABRAICATED, INSTALLED REPAIR PARTS PER SRM 53-10-9. (M)