What was found
DURING SCHEDULED C-12 INSPECTION, FOUND CORROSION (C53-107-02 PART 2 OF 2) ON FLOORBEAM STA 328, RBL 33 AND RBL 41, WL 208. FABRICATED REPAIR PARTS AND INSTALLED TOP CHORD AT BS 328, RBL 31 TO RBL 65, WL 208 PER SRM 53-10-51.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED C-12 INSPECTION, FOUND CORROSION (C53-107-02 PART 2 OF 2) ON FLOORBEAM STA 328, RBL 33 AND RBL 41, WL 208. FABRICATED REPAIR PARTS AND INSTALLED TOP CHORD AT BS 328, RBL 31 TO RBL 65, WL 208 PER SRM 53-10-51.