What was found
DURING SCHEDULED C-23 INSPECTION, FOUND PILLOWING SKIN JUST FWD OF RT OUTFLOW VALVE ABOVE STR 25 RT. REMOVED AND REPLACED SKIN PANEL BS 907 TO BS 1016 STR 20 RT TO 25 RT PER SRM 53-30-04, PAGE 3, PARAGRAPH 5, 51-30-08, 51-20-01, 51-32-05 AND 51-30-02.