What was found
DURING SCHEDULED C-8 INSPECTION, FOUND CORROSION ON FLOORBEAM STA 310, WL 208, RBL 5. REMOVED CORROSION AT BS 310, WL 208, RBL 5, FOUND OUT OF LIMITS. FABRICATED REPAIR PARTS AND INSTALLED PARTS AT BS 310, WL 208, RBL 5 PER SRM 53-00-51.