What was found
C-CHECK, RIGHT O/B MID FLAP AT I/B TRACK IS GOUGED ON LWR L/E SURFACE. REMOVED DAMAGED AREA, FABRICATED REPLACEMENT DOUBLER FROM .032301 CRES 1/2 HARD MATERIAL, IAW SRM 57-53-01. TREATED AND PRIMED IAW SRM 51-20-01. INSTALLED DOUBLER IAW SRM 57-53-01.