What was found
UPON (PHASE 9) INSPECTION DISCOVERED RIGHT HORIZONTAL STABILIZER UPPER TRAILING EDGE PANEL DELAMINATING. REPAIRED HORIZONTAL 1E PANEL WORK ORDER 02-0001, AND 02-0002, JOB NR 10-1166, WORK PERFORMED BY EVERGREEN AIR CENTER. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
UPON (PHASE 9) INSPECTION DISCOVERED RIGHT HORIZONTAL STABILIZER UPPER TRAILING EDGE PANEL DELAMINATING. REPAIRED HORIZONTAL 1E PANEL WORK ORDER 02-0001, AND 02-0002, JOB NR 10-1166, WORK PERFORMED BY EVERGREEN AIR CENTER. (M)