Service difficulty report · Contactor · Bombdr BD7001A10

Difficulty date
February 15, 2003
Submitted
May 6, 2003
Operation
Air carrier
Aircraft
N949GP
Make and model
Bombdr BD7001A10
Aircraft serial
9049
Engine
Rroyce BR700710A110
Part
Contactor
Part number
MS272227
Condition
Arced
Location
Panel
Part time
137 hours
Stage of operation
NR
How discovered
9
Nature of condition
B
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

TERMINAL C2 OF CONTACTOR KPB101 WAS NOT TORQUED PROPERLY. THIS TERMINAL IS SUBJECTED TO HIGH ELECTRICAL LOADING AND AS SUCH EXPERIENCED ARCING DUE TO ITS BEING LOOSE. ARCING CAUSED CONTACTOR TERMINAL COVER, (PN MS272436), TO MELT NEAR TERMINAL C2. PLASTIC PART OF LUG AT THE CONNECTION POINT OF WIRE NR 3PB113A16 ALSO MELTED. OF BIGGER CONCERN IS WIRE 3PV100B6 THAT CONNECTS TO C1 OF THIS CONTACTOR. THIS IS A NR 6 WIRE THAT HAS AN APPRX 15 FT RUN FROM TRANSFORMER RECTIFIER UNIT(TRU) AXV100. THERE IS NO WIRE PROTECTION INSTALLED FOR THIS WIRE RUN(NOR IS THERE ANY FOR THE NR10 WIRE THAT RUNS FROM C2 TO ROW N OF THE COCKPIT CIRCUIT BREAKER PANEL). NOTE: HALF OF TERMINALS ON CONTACTOR WERE MISSING LOCK WASHERS.