What was found
TYS - DURING A SCHEDULED 1C INSPECTION, THE APU FIRE LOOP WAS GOUGED. MAINTENANCE REMOVED AND REPLACED THE APU FIRE LOOP IAW EMB 145 MM 26-10-00. OPS CHECKED GOOD. REPAIRS WERE SATISFACTORY, AIRCRAFT RELEASED FOR SERVICE. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
TYS - DURING A SCHEDULED 1C INSPECTION, THE APU FIRE LOOP WAS GOUGED. MAINTENANCE REMOVED AND REPLACED THE APU FIRE LOOP IAW EMB 145 MM 26-10-00. OPS CHECKED GOOD. REPAIRS WERE SATISFACTORY, AIRCRAFT RELEASED FOR SERVICE. (M)