Service difficulty report · Pitot Tube · Emb EMB145ER

Difficulty date
February 1, 2002
Submitted
February 1, 2002
Operation
Air carrier
Aircraft
N14930
Make and model
Emb EMB145ER
Aircraft serial
145011
Aircraft time
10,914 hours, 8,556 cycles
Part
Pitot Tube
Condition
Miswired
Location
Pitot Heat
Stage of operation
IN
How discovered
C
Nature of condition
W
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING A SCHEDULED 1C INSPECTION, THE PITOT AND STATIC PORT HEATING CHECK FAILED STEP 29 OF TASK CARD 30-31-00-710-001-AOO, WHEN HEATING/PITOT 1 CIRCUIT BREAKER IS PULLED THE STATIC PORTS 1 AND 2 BECAME COOL INSTEAD OF 1 AND 4. MAINTENANCE REWIRED STATIC PORT HEATERS NR 2 AND 4, OPERATIONAL CHECKED GOOD. REPAIR PROCEDURES ARE SATISFACTORY, AIRCRAFT WILL BE RELEASED UPON COMPLECTION OF INSPECTION.

More about the Emb EMB-145ER