What was found
TYS, During a scheduled 1C inspection, the left elevator attach bellcrank was found gouged. Maintenance blended the damage, performed dye penetrant inspection (no defects noted) and restored protective finish. I/A/W-EMB-GST-0415/02, repair procedures are satisfactory and aircraft will be released upon complection of inspection.