As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
TYS DURING A SCHEDULED INSPECTION THE BELLY DRAIN GUSSET STRAP AT FRAME 53 WAS FOUND TO BE CORRODED. MAINTENANCE REMOVED AND REPLACED THE GUSSET STRAP IAW EMB-145 SRM 51-40-02 AND EMB-145 CPM 51-21-04 AND 05. THE REPAIR WAS SATISFACTORY, THE AIRCRAFT WILL BE RELEASED UPON COMPLETION OF INSPECTION.