What was found
TYS DURING A SCHEDULED 1C/2C INSPECTION THE LEFT OMEGA BEAM HAS CORROSION IN THE GALLEY AREA. MAINTENANCE FABRICATED AND INSTALLED REPAIR IAW EMB135/145 SRM 53-21-10.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
TYS DURING A SCHEDULED 1C/2C INSPECTION THE LEFT OMEGA BEAM HAS CORROSION IN THE GALLEY AREA. MAINTENANCE FABRICATED AND INSTALLED REPAIR IAW EMB135/145 SRM 53-21-10.