What was found
TYS During a scheduled inspection the L/H #1 passenger window frame was found to be nicked. Maintenance accomplished a blend out repair which included a NDT inspection IAW EMB GST#1393/02, EMB-145 M.M. 56-20-00, CPM 51-21-04, 51-21-05, and 51-21-06. The repair was found to be satisfactory, the aircraft will be released upon completion of inspection.