As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING A SCHEDULED 2C INSPECTION THE CENTER LAV FLOORBEAM SHOWS SIGNS OF CORROSION. MAINTENANCE REMOVED AND REPLACED THE CENTER LAV FLOORBEAM, REMOVED AND REPLACED THE CENTER CARBON FIBER BEAM, PRIMED AND PAINTED THE CENTER LAV FLOORBEAM IAW EMB 135/145 SRM 51-40-02, CPM51-21-05-06. ALL WORK WAS ACCOMPLISHED AND WILL BE RELEASED UPON COMPLETION OF ALL WORK.