What was found
TYS, DURING A SCHEDULED INSPECTION THE CARGO FLOOR LONGITUDINAL BEAM JUST AFT OF LOADING RAMP WAS GOUGED. MAINTENANCE BLENDED THE DAMAGED AREA ON FLOOR SUPPORT AT FR68, FABRICATED AND INSTALLED A DOUBLER, ALODINED, PRIMED AND PAINTED IAW EC5320-01096. THE REPAIR WAS SATISFACTORY AND THE AIRCRAFT WILL BE RELEASED UPON COMPLETION OF INSPECTION.