What was found
DURING A SCHEDULED 2C INSPECTION THE LT FLOORBEAM WAS FOUND CORRODED. MAINT. REMOVED AND FAB. A NEW FLOORBEAM. CLEANED SURFACE CORROSION,PRIMED,PAINTED AND INSTALL THA NEW FAB. PART IAW EMB 135/145 SRM 51-10-03 AND CPM 51-21-03,05,06. ALL WORK WAS ACCOMPLISHED AND WILL BE EL. UPON COMPLETION OF ALL WORK.