As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING A SCHEDULED INSPECTION THE FORWARD FLOORBEAM AT FRAME 20 WAS FOUND TO BE CORRODED. MAINTENANCE ACCOMPLISHED A DOUBLER REPAIR IAW EMB SRM 53-21-10 AND CPM 51-21-04/05/06, THE REPAIR WAS SATISFACTORY. THE AIRCRAFT WILL BE RELEASED UPON COMPLETION OF INSPECTION.