As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
TYS DURING A SCHEDULED 3C INSPECTION THE LT OMEGA BEAM WAS FOUND CORRODED. MAINT REMOVED CORRODED AREA, FABRICATED A NEW DOUBLER AND INSTALLED FILLER, SHIMS, PLATE AND DOUBLER. ALODINED, PRIMED AND REPAINTED WORK AREA. REINSTALLED RAMP ANGLE. ALL WORK WAS ACCOMPLISHED IAW EMB 135/145 SRM 51-21-04; 51-40-02 AND EMB 135/145 CPM51-21-04/05/06. ALL WORK WAS ACCOMPLISHED AND WILL BE RELEASED UPON COMPLETION OF ALL WORK.