As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING A SCHEDULED 1C INSPECTION THE LT FLOORBEAM WAS CORRODED. MAINT. REMOVED THE CARBON FIBER AT FR 20 AND FAB A NEW PART TO THE FLOORBEAM. ALODINED, PRIMED AND PAINTED AND REINSTALLED IAW SRM 53-21-10; CPM 51-21-04-05-06 AND SRM 51-40-02. ALL WORK WAS ACCOMPLISHED AND WILL BE RELEASED UPON COMPLETION OF ALL WORK.