What was found
SHV- DURING C-CHECK THE RIGHT HAND MAIN LANDING GEAR WHEEL WELL AFT RIB PANEL WAS FOUND TO BE CRACKED. MAINTENANCE REMOVED AND REPLACED THE AFFECTED PANEL IAW EMB 145 IPC 53-04-10. THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SHV- DURING C-CHECK THE RIGHT HAND MAIN LANDING GEAR WHEEL WELL AFT RIB PANEL WAS FOUND TO BE CRACKED. MAINTENANCE REMOVED AND REPLACED THE AFFECTED PANEL IAW EMB 145 IPC 53-04-10. THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE.