What was found
DURING A SCHEDULED INSPECTION CORROSION WAS FOUND ON THE AFT GUSSET AT FRAME 15. MAINTENANCE ACCOMPLISHED A BLEND OUT REPAIR IAW SRM 53-21-10 AND CPM 51-21-04,05,06. THE AIRCRAFT WILL BE RELEASED UPON COMPLETION OF INSPECTION.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING A SCHEDULED INSPECTION CORROSION WAS FOUND ON THE AFT GUSSET AT FRAME 15. MAINTENANCE ACCOMPLISHED A BLEND OUT REPAIR IAW SRM 53-21-10 AND CPM 51-21-04,05,06. THE AIRCRAFT WILL BE RELEASED UPON COMPLETION OF INSPECTION.